Bath to Shower Conversion in Croydon: What to Check Before the Bath Comes Out

A bath to shower conversion in Croydon replaces the bath with a shower in the same space, usually a tray and glass enclosure, sometimes a level-access floor. Bathroom Fitters Croydon checks five things at a free survey before anything is removed: space, services, water management, how your household uses the bath, and any consent the property needs. Then we quote the route that fits.

Book a free conversion survey
Fitter fixing a glass screen for a walk-in shower

Bath to shower conversion in Croydon: the quick answer

A conversion is a room, services and household decision, not a fixture swap. It is often the simplest route to a better shower because the bath's waste is already in place, but the tray, the supply and the walls behind the bath all have to suit it. The five checks below decide whether a conversion fits, and which kind.

CheckThe questionWho settles it
SpaceDoes a shower fit the bath footprint with room to step in, dry off and open the door?You measure; we confirm at survey
ServicesWill your hot water system and pressure feed the shower you want?We test at survey
Water managementCan the waste take the tray, and is the wall behind the bath sound enough to tank?We check at survey and at strip-out
HouseholdDoes anyone still need a bath, now or later?You
PermissionDo a landlord, freeholder or managing agent need to agree?You, with our help on what to ask

Choose the conversion route that fits the room and household

There are three routes, and none is best in general. Keeping the bath with a better shower over it suits households who still bathe children or pets; a tray and enclosure suits most family bathrooms; a low-threshold or level-access shower suits anyone for whom a step is a problem. The table sets out when each works.

RouteUsually suitsCheck firstMay not suit
Shower over the bath, upgradedYoung children, pets, a household that still bathesWhether the bath is sound, a screen that controls splash, pressure for the new showerAnyone who struggles to step over the bath edge
Tray and enclosure in the bath spaceMost family bathrooms and en-suitesWaste route and fall, wall condition behind the bath, tray size against the footprintRooms where the bath recess is too narrow to stand in comfortably
Low-threshold or level-accessReduced mobility, future-proofing, a more open roomFloor construction, depth for the drain, door and circulation spaceRooms where the floor cannot be cut or raised

Upgrading the shower over the bath

Keeping the bath is a deliberate choice, not a failure to convert. A thermostatic shower, a fixed screen long enough to stop splash and resealed or retiled walls give a much better shower without losing the bath. It works only if the bath itself is sound and stable, the wall behind it is dry, and the supply can feed the new shower. We check all three before quoting.

A standard tray and enclosure in the bath space

This is the most common conversion. The bath comes out, a tray goes into the space, and an enclosure or fixed walk-in panel goes around it. The tray follows the waste: a low-profile tray needs enough fall on the run to the stack, and a long run may mean a standard-height tray.

The wall behind the bath is usually exposed for the first time in years, and it is tanked before tiling. The walk-in showers page covers tray and screen options in depth.

A low-threshold or level-access shower

A low-threshold tray still has a small step; a level-access shower has none, because the former or tray sits flush with the floor and the floor falls to the drain. Level access needs depth below the floor for the drain and a waste route with fall, which on a suspended timber floor means assessing the joists. The accessible bathrooms page covers seats, rails and grants, and the wet rooms page covers a fully waterproofed floor.

The five checks before removing a bath

Each check below separates what you can note before we visit from what we confirm at the survey. Bringing your notes speeds up the quote; our checks are what make it fixed. Nothing is removed until all five are settled, because a bath that comes out cannot easily go back.

Space: footprint, access and door clearance

A shower that fits the bath's length can still be awkward to use. What matters is the standing space inside, the space to step in and dry off outside, and whether the door, the toilet or the basin clashes with the screen. A bath is typically 1,700 mm long; a shower in that space works well, but a 700 mm wide recess between two walls can feel tight. Measure the bath, the room and where the door opens, and tell us who will use the shower.

Services: hot water, plumbing and electrics

The shower has to match the water system. A combi boiler feeds a mixer at mains pressure, limited by its flow rate; a gravity cylinder with a loft tank usually needs a pumped shower for good flow. Weak hot water may point to an electric shower, which needs its own circuit installed and certified by our registered electrician. We test pressure and flow at the shower position and specify to match.

Water management: waste fall, tanking and ventilation

The water has to leave as fast as it arrives, the walls have to keep it out, and the steam has to go somewhere. The bath waste is usually in the right place, but a shower tray needs a trap and a fall that a bath may not have had. The wall behind the bath is often plasterboard or old plaster that was never meant to be wet; it is tanked with a named system before tiling, and we photograph it. A shower puts more steam into the room than a bath, so we check the extractor is sized and ducted to outside.

Household: daily use and keeping a bath

Removing the only bath in the home is a decision in its own right. Young children, a dog, someone who soaks for pain relief, or a family member who prefers baths are all reasons to keep one, or to keep the bath and upgrade the shower over it. Equally, someone who can no longer step over the bath edge safely is a reason to convert. We make no claims about resale value either way; the right answer is the one that suits the people who live there.

Permission and property status

Owners of houses usually need no consent for a like-for-like conversion. Tenants need the landlord's written agreement. Leaseholders in flats usually need the freeholder's or managing agent's consent for anything touching shared pipes, structure or the floor, and some leases restrict work hours and waste removal. Tell us your tenure at survey and we will tell you what to ask for.

A straight swap of bath for shower in the same position does not usually need Building Regulations approval. A new circuit for an electric shower or pump is notifiable under Part P, and our electrician notifies and certifies it. Altered drainage, floor structure or a new external vent can bring in Building Control, and a vent in a conservation area can need consent.

We confirm in the quote which, if any, apply to your conversion, and handle the notifications. Part G of the Building Regulations covers hot water safety; we fit thermostatic control on every conversion. The Water Fittings Regulations require backflow protection, and a handset hose that can reach into the toilet needs a higher category of protection, which we specify.

What a well-scoped conversion involves

The order of work is what makes a conversion last, because the finish cannot fix what is behind it. Survey, removal, first fix, drainage, substrate, tanking, tiling, fittings, testing and handover each depend on the stage before, and we check each one before the next covers it.

  1. Survey: space, supply, waste, wall and floor condition, household needs, tenure.
  2. Removal: the bath, panel and surrounding tiles out, disposed of by a registered waste carrier.
  3. Inspection: the wall and floor exposed for the first time in years; any damage shown to you and priced before we continue.
  4. First fix: supply pipework, the shower valve, the waste and any new circuit, with positions confirmed with you before boxing in.
  5. Tray and substrate: the floor levelled and the tray or former set and connected; the walls boarded with tile backer board where needed.
  6. Tanking: the shower area waterproofed with a named system and photographed.
  7. Finish: tiles, enclosure or screen, controls and sealant, with cure times observed.
  8. Test and hand over: leaks, drainage, temperature and splash checked; certificates and instructions handed over with our written workmanship guarantee.

Published guides put a bath to shower conversion at one to three days on site (MyJobQuote), longer where a new circuit, floor work or full retiling is involved, plus cure time before first use. Your programme shows the days.

How to compare conversion quotes

Compare quotes on what they include, not the headline. A conversion quote that names only the tray and the enclosure has left out most of the work. Ours lists every item below as included, excluded or subject to survey; check that any other quote you receive covers the same ground before comparing totals.

  • Removal and disposal of the bath, panel and tiles.
  • Inspection and repair of the wall and floor behind the bath, with a stated rate for anything found.
  • Supply and waste alterations, and the waste route and fall.
  • The tray or former, enclosure or screen, valve and head by model number.
  • The tanking system by name and the areas it covers.
  • Tile backer board, tiling to which walls and to what height, and the floor.
  • Any electrical work, with the certificate.
  • The extractor and where it discharges.
  • Making good and decorating.
  • Exclusions, and how changes are agreed once work has started.

What changes the cost of a conversion

Cost follows scope. The main variables are the condition of the wall and floor behind the bath, whether the waste needs altering, the tray and enclosure, how much of the room is retiled, any new circuit or pump, and whether the floor is cut for level access. The bathroom costs guide sets out published ranges and what moves a job up or down them.

Bath to shower conversion FAQs

Is a bath to shower conversion worth it?

It is worth it if a shower suits the household better than a bath: easier to use, quicker, better for someone who struggles with the bath edge. It is not if someone still needs a bath daily. We make no resale claims either way.

Should I remove the only bath in the house?

That depends on who lives there and who might. Young children, pets and anyone who bathes for comfort are reasons to keep one, or to upgrade the shower over the bath instead. Someone who cannot safely step into a bath is a reason to convert.

Can a shower fit where my bath is?

Usually. A standard bath footprint takes a shower tray and enclosure comfortably. A narrow recess between two walls can feel tight, and the door swing and toilet position matter. We measure at survey and show you the layout.

Do I need permission to replace a bath with a shower?

Not usually, for a like-for-like swap in a house. A new electric shower circuit is notifiable under Part P, which our electrician handles. Tenants need the landlord's agreement and leaseholders usually need the freeholder's consent.

Walk-in shower or wet room in place of the bath?

A walk-in shower uses a tray behind a fixed panel and suits most bath spaces. A wet room waterproofs the whole floor with no tray and suits open rooms and level access. The wet rooms page explains the difference.

Can I have a level-access shower where the bath was?

Often, if the floor can be cut or built up to take a flush former and the waste has a fall to the stack. On a timber floor we assess the joists first.

What happens if you find damage when the bath comes out?

We stop, show you, and price the repair in writing before continuing. The quote states a rate for the most likely findings, such as a rotten board or a damp wall, so the price change is predictable.

Book a free bath to shower conversion survey in Croydon

Tell us the size of the bath, which floor the bathroom is on, your hot water system, who uses the room and whether it is your only bath. We will book a free survey, run the five checks and send an itemised quote for the route that fits, with our workmanship guarantee written in.

Call nowFree survey
Free survey · fixed written quote