Bathroom Installation in Croydon: Supply and Fit, Step by Step

Bathroom installation in Croydon with us means one team surveys your room for free, agrees a written scope, supplies or fits the products you choose, carries out the plumbing, tiling and certified electrics, and hands over a tested bathroom with its paperwork and our guarantee. We work through five decision gates so nothing is ordered, concealed or signed off before it has been checked.

We’re local bathroom fitters covering the London Borough of Croydon. A new bathroom is a sequence of decisions as much as a sequence of trades, so this page walks through what we confirm at each stage, what you decide, and what you receive at the end. If you’d rather talk it through, book a free survey and we’ll come and look.

Book a free survey
Fitter connecting the waste on a new bath during installation

What “Supply and Fit” Means When We Install Your Bathroom

“Supply and fit” is only useful once it says who supplies each product, what the fitting includes and what happens when the old room is opened up. Ours is built around five gates: the scope, site and responsibility questions behind every quote on this site, in the order a job runs. Each has a check we make and a decision you make before the job moves on.

GateWhat we confirmWhat you decide
1. Survey and scopeMeasurements, floor, drainage, pipework, electrics, access, what stays and what movesWhat you want from the room, and what you won’t compromise on
2. Products and supplyEvery product fits the room, the water system and each otherWho supplies what, and the final product list
3. Strip-out and first fixHidden condition, pipe and cable routes, ventilation route, substrateAny change found at strip-out, before we price and continue
4. Waterproofing and finishesThe tanking system, tile layout, floor level and sequenceTiles, flooring and finishes, after the substrate is agreed
5. Fit, test and handoverEvery connection tested, snags listed, certificates issuedThat the room is complete before the final payment

Exact inclusions still depend on your room, so the quote lists every line as included, excluded or subject to survey. Nothing here is a blanket promise that “we handle everything”; it’s a description of what handling everything has to mean.

Installation, renovation or refit: which project are you planning?

The first thing we work out on the survey is which of three jobs yours is, because they have different dependencies and different quotes.

ProjectWhat changesWhat it brings into the quote
Replacement in the same layout (a refit)New suite, taps, tiles and finishes in the existing positionsProduct fit, substrate condition, electrics for a new shower or lighting
Reconfiguration (a renovation)The toilet, bath, shower or basin movesNew waste and supply routes, drainage fall, plastering, often new circuits
A new bathroom, en-suite or cloakroomA bathroom where there wasn’t oneA new waste route, ventilation designed from scratch, and usually Building Control

Croydon Council treats these differently too: it describes a new bathroom installation as work that can be suitable for a building notice, while refurbishing an existing bathroom or toilet does not need approval in the same way. We’ll tell you which applies to your scope. For a changed layout see bathroom renovation; for a new room see en-suites and cloakrooms.

1

Gate 1: Survey, Existing Conditions and a Written Scope

The survey is free, and it is where we find the problems, not where we sell you a bathroom. We measure the room, the door swing and the ceiling height, trace the hot, cold and waste pipes, look at the floor and walls, check the consumer unit and the hot water system, and look at access: stairs, lifts, parking and where a skip could go.

What we can’t see yet, such as the floor under the bath or the state of the wall behind the tiles, goes into the quote as a written assumption or a provisional item. That way a surprise at strip-out changes a line, not the whole price.

What to have ready for the survey:
  • the changes you want, and anything you’re set on keeping
  • a shortlist of products if you have one, with model numbers
  • any history of leaks, damp or past repairs
  • whether this is your only bathroom
  • in a flat, your lease and the managing agent’s contact
  • dates that won’t work for you

The Croydon property context to raise early

Croydon’s homes vary from Victorian and Edwardian terraces north of the town centre to interwar semi-detached estates such as Spring Park and Croham Heights, larger detached houses in West Purley and Coulsdon, and blocks and conversions near the centre. None of that tells us what’s behind your tiles, which is why we survey rather than assume. It does tell us the questions to ask: original soil pipe routes and past patch repairs in older houses, leak testing and lease consent in flats, and access and parking almost everywhere.

Water across the borough is hard, whether your supply comes from Thames Water or SES Water, so we fit concealed valves where they can be reached for servicing. If a skip needs to go on the road, the skip company applies for a council permit with at least five working days’ notice, and in a controlled parking zone the bay suspension has to be approved first. We build both into the start date.

2

Gate 2: Layout, Products and Who Supplies What

Supply and fit is a responsibility model, not a promise that someone buys the products. Before anything is ordered, we agree who supplies each item, who checks it fits and who handles delivery and returns.

Supply routeWho orders and checksWhat it suitsWhat to watch
We supplyWe specify, check compatibility, order and take deliveryHomeowners who want one point of responsibility for product and fittingAgree the brand and range before the quote is fixed
You supplyYou order; we check dimensions and compatibility against your model numbers before quotingHomeowners who’ve already chosen a suite, or want a specific brandDelivery, damage and returns stay with you; a missing part can stop the job
MixedEach item is listed against a nameMost jobs: we supply concealed parts and you choose the visible onesThe quote lists every item against who supplies it

Visible products are only part of the specification. Concealed components, such as the shower valve, the waste, the WC frame, the isolation valves and the fan, decide whether the room works and can be serviced. We specify these even when you supply the rest.

Cost intent is handled on the Croydon bathroom costs guide; this page stays with scope. For layout help see bathroom design, and for specific outcomes see walk-in showers, bath to shower conversion and accessible bathrooms.

The compatibility checks that belong before ordering

Every product has a hidden dependency. These are the ones we check against your room before you order anything:

  • Shower tray size and waste position against the drainage route and the fall it needs
  • Shower valve type against your water pressure and hot water system
  • Enclosure size against the finished wall surface, after tile backer board and tiles are added
  • Vanity unit and basin against the pipe positions and the door swing
  • Tile thickness and floor build-up against the door threshold and any underfloor heating
  • Extractor fan against a real discharge route to outside
  • Bath volume and any pumped shower against the Water Fittings Regulations, which can require notifying the water company for larger baths and higher-flow pumps
  • Delivery lead times against the programme, so nothing is stripped out before the products are in

Nothing goes on order until we’ve confirmed it fits. A vanity delivered before the pipework is confirmed, or tiles chosen before the substrate is known, are the two most common ways a bathroom project loses a week.

3

Gate 3: Strip-Out, First Fix and Room Preparation

The messy early stage is where leaks, poor access and awkward layouts are either prevented or built in. We protect the route through your home, isolate the water and electrics, remove the old suite and coverings, and then look at what’s exposed before any new work starts.

First fix is everything that gets concealed: supply and waste pipework, drainage connections, cable runs for the shower, lighting and fan, the extractor duct, and any carpentry to level or reinforce the floor. We confirm fixture positions with you before anything is boxed in, because moving a valve after tiling means removing tiles.

Waste from the job is removed by a registered waste carrier and the room is cleaned and tidied at the end of each working day. If we find something the survey couldn’t see, such as rotten boards or a failed soil pipe joint, we show you, price it and agree it in writing before continuing. See bathroom tiling and flooring for substrate and floor build-up.

Ventilation, electrics and Building Control checks

Three things decide what paperwork your bathroom needs, and all three depend on scope, not on advertising language.

Ventilation.

Approved Document F sets the Building Regulations guidance for bathroom extract ventilation, and the edition that applies depends on when the work is done. We design the fan as part of the layout: which fan, where it discharges and how it’s switched, not an afterthought cut into a wall at the end.

Electrics.

Bathroom electrical work is covered by Part P. A new circuit, such as for an electric shower, is normally notifiable; some other work isn’t. Our registered electrician decides what applies to your job, carries out the work within the bathroom zones and issues the certificate. Any gas work, for example moving a boiler flue, is done by a Gas Safe registered engineer and never by a plumber without that registration.

Building Control.

A new bathroom can need a building notice to Croydon Council Building Control; a like-for-like refurbishment usually doesn’t. We confirm which route applies and who makes the application before the start date.

4

Gate 4: Waterproofing, Surfaces and Finish Quality

Finish quality is decided behind the tiles. The sequence is a stable substrate, waterproofing where the room needs it, the tile or floor finish, sealant and only then the final fixtures. Tiles, adhesive and grout are not waterproof on their own; the tanking membrane behind them is what keeps water out of the wall and floor.

We name the waterproofing system in the quote and apply it to the manufacturer’s instructions, treating corners, junctions and pipe penetrations as part of the system. In a shower area or wet room we test it before tiling and photograph the concealed stages so you have a record, and our workmanship guarantee covers the tanking we install. Silicone sealant at the edges is a maintenance item, not a substitute for waterproofing.

Why the order of work affects the result

First fix is the concealed work: pipes, cables, ducts, boards. Second fix is everything you can see: the toilet, basin, taps, screens, lights and accessories. Between them sit substrate preparation, waterproofing and tiling, each with its own curing time that we build into the programme rather than skip. A built-in bath or shower tray usually goes in before the wall tiles, so the tiles come down onto it; only a freestanding bath goes in last.

If a programme has the bath fitted before the floor is levelled, or tiles going on before the fan route is agreed, it isn’t a credible programme. We give you a written sequence after the survey and the order is specific to your room. For wet room detail see wet rooms.

5

Gate 5: Fitting, Testing, Snagging and Handover

The job is complete when everything works and the records are in your hands, not when the room looks finished. At second fix we install the sanitaryware, taps and shower controls, screens, furniture, towel rail, lighting and accessories, then test every connection, the shower and bath drainage, the extractor and the electrics.

We walk the room with you and list any snags with a date for resolving each one. At handover you receive:

  • the electrical certificate for any notifiable work
  • the Building Control completion certificate, where a building notice applied
  • product documents and warranty registration details for everything we supplied
  • photos of the concealed stages we agreed to record
  • operating notes for the shower valve, fan and any underfloor heating
  • our written workmanship guarantee

Final payment is due once the snag list is cleared, in line with the stage payments agreed in the quote.

How to Compare Bathroom Installation Quotes in Croydon

Compare quotes as five gates, not one headline figure. A lower total that leaves out waterproofing, electrics or the floor isn’t cheaper; it’s a smaller job. Use this scorecard on our quote and any other.

GateWhat a complete quote statesOursTheirs
Survey and scopeWritten assumptions about existing services and what’s subject to surveyStatedStated / Unclear / Missing
Products and supplyEach product against who supplies it, with model numbers and lead timesStatedStated / Unclear / Missing
Strip-out and first fixProtection, disposal by a registered carrier, pipe and cable routes, how hidden damage is pricedStatedStated / Unclear / Missing
Waterproofing and finishesThe tanking system named, the areas it covers, tile and floor specificationStatedStated / Unclear / Missing
Fit, test and handoverTesting, snag process, certificates, warranties, guarantee and payment stagesStatedStated / Unclear / Missing

Published UK guides suggest a full bathroom refit takes roughly one to three weeks on site, with product lead times on top. Treat any quote that gives a number of days without a survey as an estimate, not a programme.

Questions to ask any bathroom fitter in Croydon before you choose

Each question tests a gate, so a vague answer tells you something.

What are you assuming about my existing pipework, drainage and electrics?Gate 1
Who confirms each product fits before it’s ordered, and who handles returns?Gate 2
What’s included in strip-out, disposal and preparation, and how will you price what you find?Gate 3
Which waterproofing system will you use, where, and will I see it tested before tiling?Gate 4
Who does the electrics, which scheme are they registered with, and what certificate will I get?Gate 3
Does my job need a building notice, and who makes it?Gate 3
What does handover include, and what’s the guarantee in writing?Gate 5
How are changes agreed and recorded once work has started?All gates

You’re welcome to put all eight to us. The answers are on this page, and they’ll be in your quote.

Bathroom Installation Across the London Borough of Croydon

We install bathrooms across the borough in south London, from Thornton Heath, South Norwood and Addiscombe in the north to South Croydon, Purley, Coulsdon, Selsdon and Sanderstead on the Surrey edge. Postcodes cross borough lines, so we confirm coverage from your full postcode. Local pages: Thornton Heath, Addiscombe, Purley, Coulsdon, Selsdon, Sanderstead and all areas.

Book a free survey

Bathroom Installation in Croydon: Your Questions Answered

What does bathroom installation include?

For a same-layout refit: survey, strip-out and disposal, first-fix plumbing and electrics, substrate preparation, waterproofing where needed, tiling and flooring, fitting the suite and finishes, testing and handover with certificates. Design, product supply and decorating are listed in the quote as included, excluded or optional, so you can see exactly what you’re paying for.

How much does a bathroom installation cost in Croydon?

It depends on the room’s condition, whether anything moves, the products and specialist work such as a wet room or new circuits. We don’t publish prices here because a figure means little before a survey; the Croydon bathroom costs guide explains what drives the price, and your quote gives a fixed figure for your room.

How long does a bathroom installation take?

Published guides put a full refit at roughly one to three weeks on site, and product lead times add to that. After the survey we give you a written programme showing when the toilet and shower are out of use and when they’re back.

Can I supply my own bathroom suite?

Yes. Send us the model numbers and we check dimensions, waste positions and valve compatibility before quoting. Delivery, damage and returns stay with you unless the quote says otherwise, and we won’t strip out the old room until your products are on site.

Does a new bathroom in Croydon need Building Control approval?

A new bathroom, en-suite or cloakroom can need a building notice to Croydon Council Building Control, while refurbishing an existing bathroom in the same place usually doesn’t. Notifiable electrical work is certified separately by our registered electrician. We confirm which applies to your scope before we start.

Will I be able to use the bathroom during the work?

Not every day. If it’s your only bathroom, the programme shows which days the toilet is disconnected and whether it’s reconnected each evening, and how many days you’ll be without a shower. Tell us at the survey and we’ll plan the sequence around it.

What’s the difference between waterproofing and sealing?

Waterproofing (tanking) is a membrane behind the tiles that stops water reaching the wall or floor. Sealant is the silicone at the visible joints, which needs renewing over time. A shower area needs both; sealant alone is not waterproofing.

Do you fit bathrooms in flats and conversions?

Yes. We ask for the lease and the managing agent’s details at the survey, because consent is often needed for anything touching shared pipes or structure, and we leak-test the waterproofing before tiling, since a failure shows up in the home below.

Book a Free Survey for Bathroom Installation in Croydon

Tell us what you want changed, whether anything moves, who’ll supply the products and your postcode, and add photos if you have them. We’ll book a free survey and send a written quote that follows the five gates on this page, with our guarantee written in.

Sources
  1. Croydon Council, Building Control: building notices and when approval is needed. croydon.gov.uk
  2. Croydon Council, Borough Character Appraisal and Local Character Typologies (local plan evidence). croydon.gov.uk
  3. Croydon Council, skip operators permit and parking suspensions. croydon.gov.uk
  4. Water Supply (Water Fittings) Regulations 1999, regulation 5 notification; Water Regs UK bathroom guidance. legislation.gov.uk and waterregsuk.co.uk
  5. GOV.UK, Approved Document F: ventilation. gov.uk
  6. GOV.UK, Approved Document P: electrical safety in dwellings. gov.uk
  7. BAL, waterproofing wet areas before tiling. bal-adhesives.com
  8. Checkatrade, MyJobQuote and Homebuilding bathroom guides, 2024 to 2026, which give 5 to 15 working days on site for a full refit.
Call nowFree survey
Free survey · fixed written quote

Get your free bathroom quote

Takes two minutes.

No obligation. Your details are only used to arrange your survey and quote. Privacy notice