Wet Room Installation in Croydon: Structure, Route, Fall, Seal and Dry

A wet room is a level-access, fully waterproofed bathroom where the floor itself falls to a drain. Wet room installation in Croydon by Bathroom Fitters Croydon starts with a free survey of the five things the room must get right: the floor structure, the waste route, the fall, the waterproof seal and the ventilation. The tiles come last, and our guarantee covers what is under them.

Book a free wet room survey
Fitter tiling a wet room floor

Wet room installation in Croydon: what makes it different

A wet room is not a shower without a tray. It is a water-management system with five links, and a failure in any one undermines the other four. Tiles are a finish; the hidden waterproofing and drainage geometry do the work. We assess all five at the free survey, because they decide whether a wet room is possible, straightforward or unwise in your room.

LinkWhat it meansWhat we check at surveyThe decision it changes
StructureThe subfloor the former and tanking sit onTimber or concrete; joist direction and depth; deflection; rot or dampWhether a flush floor is achievable and how
RouteThe path the waste water takes to the stackStack position, existing waste runs, available fall, trap depthWhere the drain can go, whether a pump is needed
FallThe direction and gradient of the floor to the drainRoom geometry, door threshold, finished floor levelsDrain type, how far the fall runs, door and adjoining floor levels
SealThe continuous waterproof envelopeWall construction, junctions, pipe penetrations, drain interfaceWhich tanking system, how far up the walls, how the drain is sealed
DryHow moisture leaves the roomFan route to outside, window, room volumeFan size and control, whether a screen is needed

Use the same five words when you compare any other wet room quote with ours. A quote that names a tile and a drain but not the structure, the route and the seal has left the three links that fail out of the price.

Is your Croydon bathroom suitable for a wet room?

Most bathrooms can take a wet room; the question is whether it is straightforward, and the survey decides. A ground-floor room on a concrete slab with the stack nearby usually is. An upstairs room on a timber floor with the stack on the far wall is usually possible, but the route and fall decide how much floor comes up and whether the level changes at the door.

Wet rooms suit compact bathrooms where a tray and enclosure would dominate, anyone who finds a threshold difficult, and households that want the shower to be a space rather than a box. Where the user has mobility needs, the accessible bathrooms page covers seats, rails and the grant route; the wet room is often the floor that design sits on.

Timber floors, concrete floors and flats

Level access is a structural outcome, not a product feature. The same flush floor is reached differently depending on what is underneath. On a suspended timber floor, the former sits between or across the joists and the drain body needs depth below it; joists are not simply cut, and we assess what the floor can carry and where the former can sit. On a concrete slab, the former sits on or in the slab, and the question is whether the drain and the waste run can be accommodated without raising the whole floor.

In a flat, two further checks apply. The waste usually joins a shared stack, so the route and the fall are constrained by where that stack is and what the lease allows, and anything touching shared services may need the freeholder's or managing agent's consent. We ask for the lease terms at survey. In the converted houses of Addiscombe and the terraces of Thornton Heath, the floor is normally timber and the stack is normally external, which shapes the layout before anything else does.

Tanking: the waterproof layer behind the tiles

Tanking is the continuous waterproof envelope applied to the floor and lower walls before tiling, and it is the link most often done badly. Tiles and grout are not waterproof as a system; water passes through grout to whatever is behind. The membrane, corner tapes, pipe collars and drain flange have to be one compatible system, installed as the manufacturer specifies.

We tank the whole floor and the walls to the height the system and the shower position require, treat every internal corner, junction and penetration, and bond the membrane to the drain flange so the water that reaches the membrane still reaches the drain. The system is named in the quote. Before a tile goes on, we photograph the finished tanking and give you the photographs, so the work that is about to be hidden is on record. Our written workmanship guarantee covers the tanking we install.

Questions to ask about tanking before tiling starts

Ask these of any fitter, including us, and expect specific answers rather than "it's all tanked":

  1. Which tanking system is proposed, by name, and is the drain compatible with it?
  2. How far up the walls does the membrane go, and how are the corners and the floor-to-wall junction reinforced?
  3. How are pipe penetrations and the drain interface sealed?
  4. What check is made before tiling, and will I see the finished tanking?
  5. What cure time does the system need before tiling, and before first use?

Our quote answers all five, and the photographs answer the fourth.

Floor falls and drainage: where wet rooms succeed or fail

The drain position decides the direction and length of the fall, the floor build-up and whether the door threshold stays level with the landing. A fall is the gradient the floor is formed to so water runs to the drain rather than pooling. Each system has its own gradient and minimum depth, so we resolve the drainage geometry before anyone chooses tiles.

Two things to settle early. First, the waste route must reach the stack with a fall throughout; where it cannot, a pump is the alternative, and it is better known at survey than at strip-out. Second, the trap and strainer need cleaning access, so the drain is positioned where you can reach it, not where it looks tidiest.

Linear drain or point drain?

Linear drainPoint drain
FallOne direction, towards the channelFalls from all sides to a central point
LayoutSuits a wall or threshold position; large-format tiles work with one fallSuits a central shower area; needs tiles cut to four falls
Floor depthChannel body can need more depth below the floorUsually shallower
CleaningRemovable grating, longer channel to clearSmaller strainer, easier to lift
RouteWaste outlet at one end; check it reaches the stackOutlet central; often closer to an existing waste

Neither is better in general. We choose the drain from the room's geometry, the waste route and how easy it will be to keep clean, then show you the choice and the reason in the quote.

Installation sequence: what we check before tiles hide the work

Every stage is checked before the next one covers it, because a wet room cannot be inspected once it is tiled. The order is fixed by what each stage hides, and the five links are each verified at the stage that conceals them. Our programme shows the days for your room.

  1. Survey and design settle the five links.
  2. Strip-out exposes the substrate, which is repaired or strengthened before anything goes on it.
  3. First-fix plumbing and electrics are routed.
  4. The drain and former go in and the waste connection is tested for flow and fall.
  5. The tanking goes on, cures and is photographed.
  6. Tiles are laid with the system's cure times observed, then the shower controls, screen, sanitaryware and fittings.
  7. Testing and handover, with certificates, photographs and the snag list.

Published guides put a wet room at four to seven days on site (Checkatrade, MyJobQuote), longer for complex rooms, with cure times and product lead times on top. Your programme shows the days the toilet is out of use, and we reconnect it overnight wherever the layout allows.

Ventilation, heating and safe everyday use

Containing water and controlling moisture are different jobs. The drain and tanking handle the first; the fifth link, Dry, handles the second. An open wet room puts more vapour into the air than an enclosure, so the extractor is sized for the room, ducted outside and run on a timer or humidity control (Approved Document F). The quote states where it discharges.

Three practical points. A glass screen is splash management, not waterproofing, and most wet rooms have one to keep the toilet and towels dry. Floor tiles are chosen for grip when wet, and small formats or textured finishes grip better on a sloped floor; the bathroom tiling page compares materials. Underfloor heating is comfort and drying, fitted under the tiles with the system's approval, never in place of the tanking.

Thames Water and SES Water both supply hard water here, so the shower head, glass and drain are specified for easy descaling.

Wet room installation Croydon FAQs

What is the difference between a wet room and a walk-in shower?

A wet room waterproofs the whole floor and falls it to a drain, with no tray. A walk-in shower uses a tray, low-profile or flush-set, behind a screen, with the waterproofing concentrated around it. The walk-in showers page covers the tray options; this page covers the tray-free room.

Can any bathroom be converted into a wet room?

Most can, but not all are straightforward. The floor structure, the waste route to the stack and the available fall decide it, and in a flat the lease adds a further check. Our survey tells you which of possible, straightforward or not advisable applies to your room.

Is a wet room practical upstairs?

Often. A suspended timber floor needs the former set between or across the joists with enough depth for the drain, a waste route with a fall to the stack, and tanking done properly because the room below is at risk if it fails. We survey the floor before we say yes.

Why is tanking needed if the tiles are waterproof?

Because they are not, as a system. Water passes through grout and reaches the substrate; tanking is the membrane that stops it. Without a continuous, compatible tanking system bonded to the drain, a wet room leaks within a few years, usually into the ceiling below.

Do wet rooms need a shower screen and extractor fan?

An extractor, yes, sized for the room and ducted outside. A screen is optional but usual, to keep the rest of the room dry. Neither replaces the tanking or the fall.

What should I look for in a wet room quote?

The five links, each stated: floor structure work, the waste route and any pump, the fall and drain type, the tanking system by name with the photograph commitment, and the fan and its route. Then the products by model number, the programme, the VAT treatment and the guarantee. The bathroom costs guide explains what moves the price.

Are wet rooms VAT free for disabled people?

Zero-rated where the person and the work qualify under HMRC Notice 701/7, which includes a wet room within "bathroom". Age alone does not qualify. The accessible bathrooms page explains the rules and the Disabled Facilities Grant.

Book a free wet room survey in Croydon

Tell us which floor the bathroom is on, whether it is a house or a flat, where the existing shower drains, and who will use the room. We will book a free survey, check the five links and send an itemised quote with the tanking system, drain, fall and fan route stated, a programme, and our workmanship guarantee written in.

Call nowFree survey
Free survey · fixed written quote

Get your free bathroom quote

Takes two minutes.

No obligation. Your details are only used to arrange your survey and quote. Privacy notice