Bathroom Renovation Cost in Croydon: 2026 Installation and Refit Guide
Published UK guides put a new bathroom at £5,500 to £8,000 including materials (Checkatrade, table dated May 2024) and a standard full refit at £6,000 to £8,000 (MyJobQuote, updated 20 July 2026). No verified Croydon average exists. This guide explains what those figures cover, what moves a job up or down them, and how our free survey turns a range into a fixed, itemised quote.
Typical bathroom prices in Croydon by project
These are typical supply-and-fit ranges for London bathroom jobs in 2026. They are a starting point for budgeting, not a quote: your free survey and written quote give the fixed figure for your room.
| Project | Typical range | What moves it |
|---|---|---|
| Bathroom fitting, whole job | £6,500 to £16,000 | Room size, layout changes, suite and tile choice |
| Bathroom installation, standard family bathroom | £5,000 to £12,000 | Supply and fit or fit only, products, electrics |
| Renovation or refurbishment | £4,500 to £12,000 | What moves, the condition behind the tiles |
| Bathroom refresh | £2,000 to £5,000 | How much is retiled or replaced |
| Wet room | £6,500 to £18,000 | Floor build-up, drainage route, tanking area |
| En-suite | £5,500 to £13,000 | New waste route, ventilation, Building Control |
| Cloakroom or downstairs toilet | £2,000 to £4,000 | Distance to the soil pipe, space |
| Walk-in shower or shower installation | £2,000 to £5,000 | Tray or level access, screen, valve |
| Bath to shower conversion | £2,000 to £5,000 | Reusing the waste, retiling, screen |
| Accessible bathroom | £4,500 to £12,000 | Level access, seating, grab rails, layout |
| Tiling labour, mid-sized bathroom | £1,000 to £2,500 | Tiled area, tile format, wall preparation |
The published UK guide figures below are national or regional, with their sources and dates. London jobs usually sit towards the top of them.
How much does a bathroom renovation cost in Croydon in 2026?
The honest answer is a range with a label on it. Every figure below is a third-party planning benchmark with its source and date, not our price list. Use it to set a budget band, then book a free survey for your actual room; we can only price your bathroom after seeing it, and so can anyone else.
The table covers the job types we fit. Where a publisher gives both a range and an average, both are shown. "Including materials" means the publisher says products are in the figure; "labour" means products are not.
| Job type | Published guide figure | Source and date | What the figure covers |
|---|---|---|---|
| New bathroom installation (replace the full room) | £5,500 to £8,000, average about £7,000; larger or high-end work £14,000 and above | Checkatrade new bathroom cost guide, main table dated May 2024, article updated 30 January 2025 | UK ballpark including materials; sample size not published |
| Full renovation or refit, by specification | Budget £3,500 to £4,500; standard £6,000 to £8,000; premium £11,000 to £15,000; average £7,000 | MyJobQuote full bathroom cost guide, updated 20 July 2026 | UK, materials and fitting; based on quotes on its platform, bathroom sample not disclosed |
| Complete renovation | About £7,000; £7,000 to £15,000 and above for larger or more involved rooms | HomeBuilding bathroom cost guide, updated 9 April 2025 | Named quantity surveyor estimate, not a survey |
| Like-for-like suite swap, same layout | £1,250 to £1,500 labour | HomeBuilding bathroom cost guide, updated 9 April 2025 | Removing and fitting a suite only; not tiling, preparation or electrics |
| Fitter labour for a full bathroom | £1,800 to £4,000 | MyJobQuote full bathroom cost guide, updated 20 July 2026 | Labour only, UK; see the labour-only section below |
| Wet room | £4,000 to £12,000, average £8,000 | Checkatrade wet room cost guide, table dated May 2024 | UK installed; MRICS contributor's ballpark |
| Wet room, by size | £4,000 to £7,000, average £5,500; small £4,700, standard £5,900, large £8,350 | MyJobQuote wet room cost guide, updated 22 September 2026 | Assumes a Midlands property and an existing room in reasonable condition |
| Walk-in shower | Supply £750 to £3,000 (average £1,500) plus installation average £600; combined average £2,100, stated as plus VAT | Checkatrade walk-in shower guide, updated 31 July 2024 | Shower area only, not a full room; VAT excluded |
| Walk-in shower, simple to high-end | About £1,500 to £7,500 | HomeBuilding walk-in shower guide, 10 March 2025 | Expert commentary and retail examples |
| Bath to shower conversion | £1,000 to £5,000, average £2,800 | MyJobQuote bath to walk-in shower guide, updated 16 January 2026 | Platform quotes; regional split not disclosed |
| Bath to shower conversion, minimum | £1,500 to £2,000 as a minimum for replacing a bath with a shower | HomeBuilding walk-in shower guide, 10 March 2025 | Floor of the range, not a typical total |
| En-suite (new) | £4,000 to £7,000 in one contractor's answer; other answers vary | MyJobQuote en-suite question page, indexed 11 September 2026 | Contractor Q&A, not a cost guide; a new room needing drainage work sits above general bathroom figures |
| Cloakroom or downstairs toilet | Materials £800 to £1,100 plus labour £1,200 to £1,800 | Checkatrade downstairs toilet guide, indexed 22 March 2024 | Groundworks for a new waste route add cost |
| Cloakroom or downstairs toilet | £2,000 to £4,000, average about £3,000 | MyJobQuote downstairs toilet guide, updated 29 July 2026 | Platform quotes; sample not given |
| Bathroom tiling, walls and floor | £800 to £1,200 per bathroom; labour about £50 per square metre or £200 to £350 per day | Checkatrade tiling cost guide, updated 19 December 2024 | UK; tile price excluded from labour figures |
| Bathroom tiling, medium room, ceramic | £900 to £2,050 walls and floor; labour £20 to £40 per square metre or £150 to £200 per day | MyJobQuote bathroom tiling guide, updated 7 September 2026 | Use the scoped table figures, not the page's lower intro figure |
| Accessible bathroom (small disabled-access wet room conversion) | About £4,950 | MyJobQuote wet room cost guide, updated 22 September 2026 | Not a Croydon quotation; see the grant and VAT notes under permissions |
Two further points on reading this table. London figures exist but are thin: MyJobQuote gives about £8,500 for a mid-range London bathroom and says London runs 10 to 20 per cent above its national average (updated 20 July 2026), and the FMB quotes one London member at roughly £4,250 for a small update up to £9,000 for a large room (18 September 2025). Neither is a measured Croydon dataset.
Pages with "Croydon" in the title mostly use modelled numbers. BuildBank's £4,600 to £13,800 forecast (March 2026) applies a local multiplier to national data, and Handld's £5,050 to £7,800 standard refit is a national estimate adjusted for city size. Treat these as models, not as what Croydon fitters charge. Our research found no independently verified set of completed 2026 Croydon bathroom prices.
Which kind of bathroom project you are budgeting for
Classify the work before the finish level. A "budget" and a "premium" bathroom can involve the same strip-out, preparation and services; the labels describe products, not scope. The three scopes that change the price most are a refresh, a like-for-like full refit, and a new or relocated bathroom. Wet rooms and accessible adaptations are specialist versions of those three.
| Scope | What is usually involved | Where the benchmark sits |
|---|---|---|
| Cosmetic refresh | Keep the suite; regrout, replace taps or a shower, repaint, maybe retile one area | Below the full-refit ranges; Checkatrade's remodel guide starts at £1,500 (indexed 28 March 2025), which is not a strip-out budget |
| Like-for-like full refit | Strip out, keep the layout, new suite, tiling, flooring, fan, decoration | The £5,500 to £8,000 Checkatrade range (May 2024) and MyJobQuote's standard tier (July 2026) describe this scope |
| New or relocated bathroom | New drainage and supply routes, structural checks, possibly a new room | Above the refit ranges; priced on survey |
| Wet room or accessible bathroom | Whole-floor waterproofing, falls to a drain, level access, support fixings | Separate ranges above; grant and VAT rules may apply |
Refresh or complete like-for-like refit
Keeping the layout does not tell you what is behind the tiles. A bathroom renovation that retains the layout still needs strip-out, floor and wall preparation, waterproofing in the wet area and new electrics for a fan or shower. Ask the fitter to list which items are retained, which are replaced, how much tiling is included in square metres, and whether substrate repair and tanking are priced or excluded.
New bathroom, en-suite, wet room or layout change
Creating a bathroom costs more than replacing one because of routes, not room size. A compact en-suite in a bedroom needs a new waste route to the soil stack, a water supply, an extractor duct to outside and usually a new electrical circuit. The en-suite and cloakroom and bathroom installation pages explain the work; the cost question is where each service runs and what has to be opened up and made good.
A wet room adds floor build-up, falls and a tanking system across the whole floor, which is why its ranges overlap and exceed a standard refit. A walk-in shower inside an ordinary bathroom is a smaller job, which the Checkatrade shower-area figures (July 2024) reflect. Do not price a wet room from a walk-in shower guide.
What a bathroom renovation quote should include
A quote becomes comparable when every line has a status and an owner. We call this the scope ledger: each item is Included, Owner-supplied, Excluded, an Allowance, or Subject to survey, and your contingency sits outside all five. Citizens Advice says a written quote should state the work, materials, total price, VAT and when the price can change.
Use this checklist when you read any quote. Our quotes arrive with every row already marked; in anyone else's, a row with no status is a question, not a zero.
| Work item | Status to confirm | Question to ask |
|---|---|---|
| Floor and route protection, dust control | Included or excluded | Who protects the hallway and stairs? |
| Strip-out and waste removal | Included, or skip and permit excluded | Is disposal priced, and who books the skip? |
| Floor and wall preparation | Included to what standard | Is levelling, boarding or replastering in? |
| Plumbing first fix and second fix | Included | Do pipes move, and is that priced? |
| Electrics (fan, shower, lighting, shaver point) | Included or separate electrician | Who does it, is it notifiable, what certificate do I get? |
| Ventilation | Included | Where does the duct discharge outside? |
| Waterproofing or tanking | Included, with system named | Which system, where, and can I see it before tiling? |
| Sanitaryware, taps, shower, furniture | Owner-supplied or allowance | What is the allowance, and what happens if I spend more or less? |
| Tiles, adhesive, grout, trims | Owner-supplied or allowance; coverage in square metres | Is the labour priced per square metre of wall and floor? |
| Flooring and decoration | Included or excluded | Is ceiling and woodwork painting in? |
| Testing, commissioning, snagging, paperwork | Included | What documents are handed over? |
| Hidden damage found after strip-out | Subject to survey | How will it be shown, priced and agreed? |
Do not add a publisher's component prices on top of a whole-project range. Checkatrade's old-bathroom removal figure of £600 to £1,000 (table dated May 2024), for example, overlaps with its £5,500 to £8,000 total; adding one to the other double counts the work.
Labour-only versus supply-and-fit bathroom prices
A labour-only price covers fitting what you supply; a supply-and-fit price covers products and fitting. MyJobQuote's £1,800 to £4,000 fitter labour range (updated 20 July 2026) is not a bathroom price, and neither is a bathroom fitter day rate. Both leave out products, and often leave out the electrician, the tiler and waste.
Day rates appear in several guides: MyJobQuote lists a wet room fitter at £250 to £350 per day in London against £180 to £250 nationally (updated 22 September 2026), and Checkatrade gives £200 to £300 per day for wet room labour (table dated May 2024) and £200 to £350 per day for a tiler (updated 19 December 2024). A day rate only becomes a budget when you know the number of days, who else is on site and what the fitter is not doing.
Before comparing a labour-only offer with a supply-and-fit quote, confirm four things in writing: which trades are included and which you must book yourself; whether the fitter checks your products for compatibility and completeness before strip-out; who carries the delay if an owner-supplied item is late or wrong; and whether the figure is a fixed price for a defined scope or an estimate that can move. Our fit-only quotes answer all four.
What changes the cost most
Six drivers move a bathroom renovation cost more than postcode does: fixture count and tiled area, plumbing and drainage changes, wall and floor condition, electrical and ventilation scope, tile format and pattern, and concealed fittings that need maintenance access. Each driver is a yes-or-no question you can settle before accepting a price, so settle them.
- Tiled area: floor area is not tiled area. A 4 square metre room can carry 20 square metres of wall tile. Ask for tiled coverage in square metres, which is how bathroom tiling labour is normally priced.
- Tile format: large-format, mosaic, herringbone and natural stone take longer to set and cut than standard ceramic. Ask whether the labour rate assumes your tile.
- Fixtures: every extra item (bidet, second basin, towel radiator, niche) adds supply, waste or electrical work.
- Concealed cisterns and shower valves: ask how they will be accessed for repair later and whether the boxing and access panel are priced.
- Coordination: one fitter who manages the electrician and tiler costs differently from three separate trades you schedule yourself.
Moving plumbing and changing the layout
Moving a toilet is about the waste route, not the distance. The soil pipe needs a fall to the stack, the floor may need opening up, and a ground-floor move can involve underground drainage, which is Building Regulations Part H territory (GOV.UK Approved Document H). Moving a basin or shower is usually simpler but can still mean chasing walls and reinstating plaster.
Ask the fitter to say where supply and waste will run, what will be opened up, what will be made good, and whether a new circuit or a different duct route is needed. No one can confirm a layout is feasible from a photograph, so treat any price for relocation as subject to survey until the floor is inspected.
Preparation, waterproofing and hidden damage
Known preparation and unknown repair are different budget items. Preparation (levelling, boarding, moisture-resistant plasterboard, tanking) is priced work and should be Included with its standard described. Rotten joists, old lead pipework or damp behind tiles cannot be priced until the room is stripped, so they are Subject to survey, documented with photographs when found and agreed in writing before the fitter continues.
Tiles and grout are not a waterproofing system; a separate tanking membrane is needed in wet areas (BAL technical guidance on waterproofing wet areas, and The Tile Association's explanation of BS 5385-1:2018). Ask which system is being used and ask to see it before it is covered. Older Croydon homes do not all have damaged floors, but you only find out after strip-out, so keep that line open.
Croydon access, waste and property checks
There is no evidence for a flat Croydon surcharge, but there are specific local allowances to check. Skip permits, parking suspensions, carrying distance in flats and terraces, hard water and conservation-area rules each change a line in the quote. Put each one into the scope ledger as Included, Excluded or Subject to survey rather than accepting a vague local premium.
- Skips on the road: a skip on the public highway needs a Croydon Council permit, costing £78 for up to 14 days (Croydon Council skip permit application page, checked 1 October 2026). Only the skip company can apply, with at least five working days' notice (Croydon Council). The permit is not the skip hire or the whole waste budget. Skips cannot go on the A22, A23 or A232 red routes, and the council lists restricted roads including London Road, Portland Road and South Norwood Hill.
- Controlled parking zones: Croydon runs CPZs including Centre, North, South, West, East Inner, East Outer, Thornton Heath, West Thornton, South Norwood, Purley, Sanderstead and Coulsdon Town Centre (Croydon Council CPZ maps). A skip in a bay needs a bay suspension or dispensation first, and the council asks for at least five working days' notice for a suspension or dispensation (Croydon Council). Ask who arranges fitter parking and who pays for suspensions.
- Older houses: the Valuation Office Agency counts 32,240 pre-1900 and 15,590 1900 to 1918 properties among Croydon's 169,360 Council Tax properties (31 March 2026), with another 29,300 built in the 1930s. In the Victorian terraces around Thornton Heath and the converted houses of Addiscombe, the questions are floor construction, where the stopcock is, whether the bathroom sits over another home, and whether the soil stack is external. HSE notes that homes built or refurbished before 2000 may contain asbestos, including in bath panels, textured coatings and vinyl floor tiles; suspect materials need assessing before strip-out, which can add a line to the quote.
- Flats and conversions: purpose-built flats are 29.0 per cent of Croydon households and flats in converted houses 8.5 per cent (ONS Census 2021). Check the lease for alteration consent, ask the managing agent about working hours and lift protection, and price carrying materials and waste up stairs.
- Hard water: Croydon Council says Thames Water supplies most of the borough and SES Water the southern part. Thames Water describes its supply as hard and SES Water describes its groundwater as naturally hard but partially softened. Hard water shortens the life of shower valves and electric shower elements, so ask whether a scale filter or inline softener is in the specification.
- Conservation areas: Croydon lists 21, including South Norwood, East India Estate, Upper Norwood Triangle and The Webb Estate (Croydon Council). An internal refit is not a conservation trigger, but external vents, flues and altered openings can be. Check the address before the extractor duct is planned.
Compare quotes using the same completed scope
Compare the completed bathroom, not the headline quote. Put every quote through the same scope ledger, add the products you will buy and the excluded work you will still need, leave Subject to survey items visibly unpriced, and keep contingency separate. Only then compare the totals, and compare them on the same VAT basis.
Illustrative comparison only, not Croydon market prices or real quotations. Three invented offers for the same completed scope:
| Offer | Headline quote | Necessary additions | Completed-scope total |
|---|---|---|---|
| A | £6,000 | £1,200 owner purchases plus £900 excluded work | £8,100 |
| B | £7,400 | £500 owner purchases | £7,900 |
| C | £8,000 | None priced in stated scope | £8,000 |
A is the lowest headline and the highest completed price. B is £200 under A once additions are counted. C is not automatically better or worse; it has to be judged on specification, evidence and terms. Any item still Subject to survey stays unresolved in all three, and your contingency is not in any column.
On VAT: a VAT-registered fitter charges the standard rate (20 per cent, GOV.UK VAT rates) on labour and materials for work to an existing home, and HMRC VAT Notice 708 sets out the limited exceptions, which do not normally cover a domestic refit. A fitter below the registration threshold adds no VAT, which can explain a lower quote. Ask every fitter whether the figure includes VAT and whether a VAT invoice will be issued. Where a quote names a provisional allowance, ask for the amount and how the final price adjusts if you spend more or less.
Book a free survey and we will measure the room and give you an itemised quote with every line marked, VAT stated and our workmanship guarantee written in.
Contingency, unforeseen work and keeping the budget controlled
Contingency is a reserve you hold for genuinely unknown work; it is not a hidden quote inclusion and not money the fitter automatically receives. Price every known necessary item first. A reserve should not be used to cover things you already know are missing from the quote, such as tiles or a skip.
How much to hold depends on uncertainty, not on a universal percentage. A like-for-like refit in a 1990s flat with an inspected floor carries less unknown than a 1900s terrace with a suspended timber floor and a previous leak. Ask what an inspection could resolve before work starts, such as lifting a floorboard or checking the stack, and hold more where less can be checked.
When something is found after strip-out, follow a written variation path:
- The fitter stops on that item and photographs what was found.
- The fitter sets out the options, the price of each and the effect on the programme.
- You agree one option in writing before the extra work starts.
- The agreed variation is added to the contract total and the reserve is reduced by that amount.
This keeps the surprise final bill, the most common complaint in homeowner forums, out of your project.
How to reduce costs without losing essential work
Savings come from scope and specification, never from removing protection or necessary work. The safe places to save are keeping a layout that works, tiling less wall area, choosing standard-format ceramic tiles, selecting a mid-range suite and comparing supply routes. The false economies are skipping tanking, skipping the extractor, unqualified electrical work and hazardous DIY demolition.
- Keep the soil pipe and bath position where they are if the layout works; relocation is the biggest avoidable driver.
- Tile to the wet zones and paint the rest; it reduces tiled square metres without affecting waterproofing.
- Compare an allowance from the fitter's supplier against buying yourself, but check that owner-supplied products come complete and compatible, and that the fitter accepts them.
- A cheaper product is not always a cheaper installed item if it needs extra fixing or does not suit your water pressure.
- Which? suggests that regrouting, descaling and replacing selected fittings can sometimes avoid a full refit (Which?, 1 January 2026).
- Do not do electrical work yourself and do not strip out materials that may contain asbestos. Any saving is lost in rework or risk.
Timing, payments, permissions and responsibility
Treat the programme, the payment terms and the permissions as part of the budget. Checkatrade gives 5 to 10 days for a new bathroom in its summary and 7 to 15 days in its detail (updated 30 January 2025), and its Croydon directory page says one to three weeks. Elapsed time includes product lead time, drying and curing, and any variation, so plan for the longer figure if this is your only bathroom.
On payments, Citizens Advice advises avoiding full payment up front, keeping any deposit as low as possible and not agreeing to more than 25 per cent where a deposit cannot be avoided. Ask for a written schedule that ties stage payments to delivered materials and completed stages, a final payment held until testing and snagging are done, and a receipt for every payment. Ask too how long the quote is valid, how variations are priced and what counts as completion.
Permissions sit in three separate boxes:
- Planning permission: an internal bathroom normally does not need it (Planning Portal, kitchens and bathrooms guidance). Listed buildings and external changes in a conservation area need checking with Croydon Council.
- Building Regulations: electrical work in bathrooms is covered by Part P (GOV.UK Approved Document P); not every task is notifiable, so ask who does the work, which compliance route applies and what certificate you receive. New drainage falls under Part H and ventilation under Part F (GOV.UK Approved Documents). Croydon Council Building Control takes applications and inspects.
- Lease consent: in a flat, the freeholder or managing agent may need to approve alterations before you commit to a start date.
For accessible adaptations, two separate rules affect the budget. Croydon's Disabled Facilities Grant pays up to £30,000 including fees, planning costs and chargeable VAT for qualifying adaptations after an occupational therapist assessment and means test, and work must not start before written approval (Croydon Council DFG page; GOV.UK DFG eligibility). Separately, HMRC VAT Notice 701/7 allows zero-rating of providing, extending or adapting a bathroom where it is necessary for a chronically sick or disabled person's condition; age alone does not qualify, a general refit does not qualify, and the supplier applies the relief. The accessible bathrooms page explains both routes.
Ask any fitter for public liability insurance details, the electrician's competent-person scheme registration and a written contract. Ours are set out on the about page, and we show the insurance certificate before work starts.
Croydon bathroom cost FAQs
How much should I budget for a bathroom renovation in Croydon?
Start from the published scope that matches your project: £5,500 to £8,000 for a new bathroom including materials (Checkatrade, May 2024) or £6,000 to £8,000 for a standard refit (MyJobQuote, 20 July 2026), then add your own purchases, excluded work and a separate reserve. There is no verified Croydon average, so the bathroom renovation cost for your Croydon home comes from written quotes on a defined scope.
Is £10,000 enough for a bathroom remodel?
For a like-for-like refit, £10,000 sits above the standard ranges published by Checkatrade (May 2024) and MyJobQuote (July 2026) and below their premium or high-end figures. Whether it is enough depends on tiled area, whether anything moves, products and what strip-out reveals. Run it through the scope ledger before deciding.
Are these real Croydon quotes or published estimates?
They are published planning estimates from UK cost guides, each dated beside the figure. None is a Croydon quotation and none is our price. Pages that show Croydon figures mostly apply models to national data, which is useful for orientation but not evidence of local prices.
What should a full bathroom quote include?
Strip-out and disposal, preparation, plumbing, electrics with certification, ventilation, waterproofing, tiling with coverage stated, sanitaryware and fittings or an allowance for them, flooring, decoration, testing and handover paperwork, each marked as Included, Owner-supplied, Excluded, Allowance or Subject to survey. It should also state the VAT position and the variation procedure.
Is a daily rate comparable with a fixed project price?
No. A day rate needs a day count, a list of who else is on site and a statement of what is not included before it can be compared with a fixed price. Published day rates such as MyJobQuote's £250 to £350 in London (22 September 2026) are labour only and exclude products, specialist trades and waste.
Do I need to allow for a Croydon skip permit?
Only if the skip goes on the public road. Croydon Council charges £78 for a permit of up to 14 days (checked 1 October 2026), the skip company applies with at least five working days' notice, and a skip in a controlled parking zone bay needs a suspension first. A skip on a driveway needs no permit. Ask who books it and whether it is in the quote.
Can I get help with the cost of an accessible bathroom?
Possibly, through two separate routes. Croydon Council's Disabled Facilities Grant can pay up to £30,000 for qualifying adaptations after assessment, provided work has not started, and HMRC VAT Notice 701/7 allows zero-rating of qualifying bathroom adaptations for a disabled person. Neither applies to a general refit, and neither is automatic.
Will a new bathroom add a fixed amount to my property value?
No source gives a reliable figure, and forum discussion is divided, particularly on removing the only bath. Decide on the basis of how you use the room and how long you plan to stay, not on a promised uplift. This website does not offer finance and cannot guarantee any price or valuation.
Prepare your budget brief and request a local fitter introduction
A clear brief gets you a clearer quote. Before you ask bathroom fitters in Croydon to visit, gather the room dimensions, photographs of the room and of the stack and stopcock, a note of what stays and what moves, your product list or allowance, your access and parking situation, your budget band and your preferred timing.
Checklist to have ready for the survey:
1. Full postcode, property type and whether the bathroom is above another home. 2. Scope: refresh, like-for-like refit, new bathroom, wet room, bath to shower, en-suite or cloakroom. 3. What is retained, what is replaced, what moves. 4. Products you will supply, products you want us to supply, and tiled areas. 5. Access: parking, CPZ, stairs, lift, skip location. 6. Your budget band, with contingency held separately. 7. Open questions from the scope ledger, including anything you suspect behind the tiles.
Bathroom Fitters Croydon surveys for free and quotes in writing, with every item marked as included, excluded or subject to survey, VAT stated, a programme, staged payments and our written workmanship guarantee. Book a free survey and your bathroom renovation cost in Croydon becomes a fixed figure for a defined scope, not a range from a guide.